College of Knowledge - Non-Credit Course Registration

This course is divided into sessions. Please mark if you are staying for lunch for accurate meal pre-ordering. You do not need to stay for all sessions.
If you wish to take this course for Minnesota Contractor credit, please sign-up here instead.

Session I
Session II
Session III
Session IV
Lunch
All Above

Training Events

Dec 20 Sioux Falls, SD Best Western Ramkota 3200 W. Maple St.
Jan 9 Council Bluff, IA Hilton Garden Inn 2702 Mid Am. Drive
Jan 9 Scottsbluff, NE Hampton Inn 301 W. Hwy 26.
Jan 10 Lincoln, NE S.E. Community College— Jack J. Huck Cont. Ed. Center Auditorium 301 S. 68th St
Jan 10 Rapid City, SD Ramkota Inn 2111 N. LaCrosse
Jan 11 Norfolk, NE Life Long Center 801 Benjamin Ave.
Jan 12 O’Neill, NE Westside Resturant 49134 US 20
Jan 16 Spirit Lake, IA Arrowwood Inn 1405 Hwy 71
Jan 16 Valentine, NE Peppermill Resturant 502 US 20
Jan 17 Sioux Center, IA Terrace View 230 St. Andrew Way
Jan 17 North Platte, NE Quality Inn 2102 S. Jeffers St.
Jan 18 Carroll, IA Carrollton Inn 1730 Lincoln St
Jan 18 Kearney, NE Holiday Inn 110 S. 2nd Ave
Jan 19 Grand Island, NE Quality Inn 7838 S. Hwy 281
Jan 22 Jamestown, ND Fairfiled Inn 930 25th St SW
Jan 23 Minot, ND Grand Hotel 1505 N Braodway
Jan 24 Dickinson, ND Astoria Event Center 363 15th St. W.
Jan 25 Bismarck, ND Kelly Inn 1800 N. 12th St
Jan 26 Pierre, SD Drifters Bar and Grille 325 Hustan Ave
Jan 31 Watertown, SD Watertown Event Center 1901 9th Ave S.W.
Feb 7 Aberdeen, SD Ramkota Inn 1400 8th Ave N.W.

Schedule

7:00-8:00 a.m. Check in / coffee & rolls
8:00-9:15 a.m. Decking; Making the Connection
9:15-10:30 a.m. Insulation; Stop Wasting Energy
10:30-10:45 a.m. Break
10:45-12:15 p.m. Attic Ventilation Best Practices
12:15-1:00 p.m. Lunch (provided)
1:00-2:00 p.m. Fire Rated Frames
2:00-2:15 p.m. Break
2:15 –3:00 p.m. In’s and Out’s of Siding
3:00 p.m. Adjourn
 

2017 – 2018 Building Products Inc. College of Knowledge Course Outline

7:00 – 8:00 a.m.
Check in/coffee and rolls
Class starts at 8:00 a.m.

(check in is anytime between 7:00 a.m. - 7:55 a.m.)

8:00 – 9:40 a.m.
Garage Door Ups & Downs

A. Identifying different types of door panels
B. Door panel construction
C. Commercial door construction
D. Installation tips
E. Compare quality
F. Prepare opening
G. How and where to start installation
H. Prepare strut install
I. Proper light install
J. Track install
K. Double check clearance and heights
L. Squaring up track (ease of operation)
M. Installation of torsion spring
N. Safety
O. Marking and winding of springs
P. Correct tools
Q. Final adjustments
R. Prefinished jamb options
S. Roll up doors (where to use)
T. Color and rating options
U. Quality of doors
V. Proper window of door
W. Accessories and options

Break 9:40 – 10:00 a.m

10:00 – 11:30 a.m.
Stop Wasting Energy Part II

A. Review of part I
B. Types of construction
C. Prescriptive path
D. Performance path
E. Expansion of HERS Rating
F. Types of equipment used in HERS Rating
G. What to look for in testing
H. Additional areas of concern
I. Energy usage stats
J. Importance of air sealing
K. 10 energy efficient strategies
L. Myth of compressed fiberglass
M. Blown in fiberglass into wall cavities
N. Raised heel trusses (good / bad)
Lunch 11:30 – 12:15 p.m. (lunch provided)

12:15 – 1:50 p.m.
Exterior Doors
A. Construction of wood edge
B. Construction of steel edge
C. Difference on fire rated construction
D. Panel profiles
E. Popular styles
F. Construction of fiberglass
G. Species available
H. Prefinishing process
I. True wood doors
J. Styles
K. Wood door do’s and don'ts
L. Commercial wood doors
M. Frame options
N. Lite rim options
O. Construction of exterior frames
P. Sill options
Q. Packaging
R. Testing of doors. What it means.
S. Understanding Swings

Break 1:50 – 2:15 p.m.

2:15 – 3:15 p.m.
High Wind Continuous Path

A. Understanding wind
B. Ask questions of your builder
C. Proper lag bolt
D. Strap install
E. Proper epoxy install
F. Proper installation of replacement
G. Full bearing on plate
H. Connection of stud to plate
I. Wall to floor attachment
J. Wall to roof attachment
K. Proper nailing of roof sheathing
L. Proper nailing of wall sheathing
M. Continuous load path

3:15 Adjourn